The competitor is cheaper. Do the proposals include the same delivery?

Two industrial proposals may not include the same delivery. They can carry the same equipment name and still differ in scope, installation, service, warranty and lead time, so a price comparison only holds after those conditions are laid side by side. The practical method is a seven-field matrix that marks each field, for each supplier, as documented, reported by the buyer or unknown.

Status of each field

Documented
Written in a proposal or datasheet
Reported
Said by the buyer, not verified
Unknown
No source yet
Documented / reported / unknown
Marked per field and per supplier

Which conditions must be equal to compare two industrial proposals?

The seven fields of the matrix in section 05 must be filled in for both proposals, from application and operating conditions to lead time and supply terms. If one proposal covers a field and the other is silent, the silence is not a zero; it is an unknown.

The overview of this reasoning is in my product costs more.

How do I present differences in installation, training, service and optional items?

Put each one in its own line with three statements:

  • what is included;
  • what is excluded;
  • what is optional at extra cost.

A buyer comparing a quote with installation to one without will otherwise read the first as simply higher. Naming the exclusion in the other proposal is only fair when it is documented; otherwise phrase it as a question to confirm with the buyer.

The same applies to service: describe what the attendance covers and how it works, not only that it exists.

How do I demonstrate a performance difference that matters for the application?

State the difference together with its conditions:

  • measured how;
  • under which load or regime;
  • by whom;
  • against which reference.

A performance number without conditions cannot be compared with anything. Then connect it to the buyer’s own operation: what changes in use, maintenance or risk. Where the evidence does not exist yet, see how to prove durability and performance.

What should I do when information about the competing offer is missing?

Do not fill the gap with assumptions about the competitor. Mark the field as unknown, ask the buyer to confirm it from the other proposal, and compare only what is documented. A comparison built on guesses is easy to dismiss and damages the credibility of everything else in the document.

This is the central rule of the matrix: separate what is documented, what the buyer reported and what remains unknown. When the gap comes from a request for quote that was itself drafted with AI, the competitor’s specification may already be inside the buyer’s document; see RFQs written by AI and how a competitor’s spec enters the quote.

A comparison matrix the buyer can verify and share

FieldSupplier A (ours)Supplier BStatus
Application and operating conditionsBelt conveyor, 2 shifts, dusty environmentBelt conveyor, 1 shift, dry environmentA: documented; B: reported
Capacity or performance required7.5 kW gear motor, full-load test7.5 kW gear motor, no test conditionA: documented; B: unknown
Items included and excludedGear motor, base and coupling includedGear motor onlyA: documented; B: documented
Installation, training, commissioningInstallation and commissioning includedInstallation optional, at extra costA: documented; B: reported
Maintenance, service, spare parts48 h service and spare-parts kitService not mentioned in the proposalA: documented; B: unknown
Warranty and conditions12 months, excludes normal wear18 months, conditions not statedA: documented; B: reported
Lead time and supply terms30 days after order20 days, no firm dateA: documented; B: reported

Illustrative values, for a conveyor drive; fill in your own fields in the same way.

Attach the matrix to the proposal and write it so the buyer can forward it unchanged: neutral wording, sources named, unknowns left visible. It also serves as the starting point for the internal case described in engineering approves, purchasing asks for the lowest price.

Frequently asked questions

The competitor is cheaper. Do the proposals include the same delivery? +
Not necessarily. Two proposals can differ in scope and conditions even when the equipment name is the same. Lay the same fields side by side before treating the price gap as real.
Which conditions must be equal to compare two industrial proposals? +
The seven fields of the matrix, filled in for both proposals. A field one proposal leaves silent is an unknown, not a zero.
How do I present installation, training and service differences? +
In separate lines, each stating what is included, what is excluded and what is optional at extra cost. Describe what the service covers and how it works, not only that it exists.
How do I demonstrate a performance difference that matters? +
Give the measurement conditions, the regime and the reference, then connect the difference to the buyer’s own operation. A performance figure without conditions cannot be compared.
What if information about the competing offer is missing? +
Mark the field as unknown and ask the buyer to confirm it from the other proposal. Compare only what is documented; assumptions about the competitor weaken the whole comparison.
How do I prepare a comparison the buyer can verify and share? +
Use neutral wording, name the source of each field and keep unknowns visible. The buyer should be able to forward it to engineering or purchasing without editing.
Is it fair to point out what the other proposal excludes? +
Only when the exclusion is documented in that proposal. Otherwise, phrase it as a question for the buyer to confirm, so the comparison stays verifiable.
Should the matrix be sent with every proposal? +
It is most useful when a competing quote is known or likely. Start with one priority product line and adjust the fields to what that buyer actually compares.

Is your proposal comparable on its own?

Bring a product line or priority application and a recent competing quote. In a free 30-minute call, we look at how the offer is laid out and which fields the buyer cannot yet compare.